Proposed upgrades at the wastewater treatment plant included the construction of a new blower building with enclosed heavy equipment; i.e., two...
Case Studies
Proposed upgrades at the wastewater treatment plant included the construction of a new blower building with enclosed heavy equipment; i.e., two...
This customers porch was settling due to inadequate footings. The porch started as a simple deck which later was enclosed...
A homeowner called in with concerns of a growing crack in their block foundation. In addition to the compromised structural...
A homeowner called in with concerns of bowing basement walls and excess moisture in the basement. After assessing the source...
A contractor was constructing a lake home for himself on poor soils. The engineer employed 4' spread footers with a...
A homeowner from Richmond, MA called in after purchasing a new home. Some floors were sagging and the crawlspace needed...